PIK Connecting Channel to Be Dredged
access_time October 25 2016 06:20 PM remove_red_eye 1499
Reported by Nurito | Translated by Rizky Mawardi
Reported by Nurito | Translated by Rizky Mawardi
Residents request for connecting PIK channel dredging in Penggilingan, Cakung East Jakarta. Sedimentation has made the channel volume decreasing.
Previously, our area was never been flooded since 2007
Bostam Hidayat, RW 13 Penggilingan caretaker, admitted his area was flooded on Friday (10/21) by 50-70 cm.
“Previously, our area was never been flooded since 2007. We hope related unit will respond our request,” he said, Tuesday (10/25).
Channel in Tanah Sereal CleanedResponding about this matter, Subandi, Cakung Sub-district Head Section of Water Management, explained the flood was caused by several factors such as sedimentation. Previous channel’s depth was three meter, but now is only one meter. The width was 4-5 meter, but now is only two meter.
“We’ll cooperate with urban village, sub-district, and East Jakarta Sub-dept. of Water Management,” he stated.